top of page
LOGO_ARH_AWARDS_2026_COLOUR.png
Meet our 2026 Renewable Heat Award winners!

This year we again hosted the Renewable Heat Awards as part of the Australasian Renewable Heat Conference to recognise and celebrate the innovative and impactful projects leading the transition to renewable heat across the industrial and commercial sectors.

Congratulations to all the winners listed below - and to Jonathan Jutsen, who received the A2EP Lifetime Achievement Award!

 

Thanks also to all the applicants and finalists. The projects submitted were all very impressive and impactful and we look forward to sharing details of these projects soon.

​​

A2EP002 Heat Conference 2024_PPT Backgrounds_16x9_ASSETS_V13_edited.jpg

2026 Outstanding Industrial Bioenergy Project

FINALISTS:

  • Australian Consolidated Milk (ACM) Biogas Project by Complex Enviro Services

  • Boiler 6 Coal-to-Dual Fuel (Biogas and Natural Gas) Conversion by Manildra

A2EP_MCEC_LMG_4699.jpg

WINNER: Optimal Group Australia & Saputo Dairy Australia
Optimal Group Australia worked with Saputo Dairy Australia to utilise biogas which was being flared to significantly reduce fossil gas use and emissions from the site.

 

Learn more about this project

2026 Outstanding Commercial Electrification Project

FINALISTS:

  • Leichhardt Park Aquatic Centre Upgrade by Bridgeford Group

  • Two Melbourne Quarter (MQR2) Large-Scale High-Rise Hot Water Electrification by CHWAM

  • 101 Collins Street by Trane Australia

  • Victoria Park Pool Heating and Domestic Hot Water Electrification by Propool Heating

A2EP_MCEC_LMG_4700.jpg

WINNER: Monash University

This project by Monash University has seen innovative work on lowering heating hot water temperatures, heat recovery and the installation of heat pumps to enable asset electrification.

 

Learn more about this project

2026 Outstanding Industrial Electrification Project

FINALISTS:

  • Fonterra Waitoa Manufacturing Site by Fonterra

  • Electric boiler installation at Speight Brewery by Lion

A2EP_MCEC_LMG_4702.jpg

WINNER: Alsco Uniforms Australia

This project involved the installation of a high-temperature industrial heat pump which was supplemeted by heat recovered from wastewater to ensure its temperature compliance for the local water ​authority. Alsco Uniforms is looking to install similar solutions at its other sites.

Learn more about this project

Background image

© 2026 by Australian Alliance for Energy Productivity

bottom of page